Construction photographs of the new Library West - April 2005

Finished ceiling preview. |

Second floor lobby. |

Roof decking new section. |

Southeast window replacement. |

Waterproofing and brick installation east end new building. |

First floor curtain wall south side. |

Third floor stacks in new building. |

Third floor reference desk area. |

First floor Facilities Department area. |

Loading dock construction. |

Built up roof application. |

Roofing installation on south side of new building. |

Sheetrock installation. |

Sheetrock being lifted to fourth floor. |

Sixth floor graduate studies. |

Bookdrops from the inside on the east end of building. |

New brickwork on northeast facade. |

North side of library facing University Avenue. |

New exposed ductwork hangers. |

Plywood and waterproofing application on sloped roof. |

New framing for rollup security gate at escalator. |

Stairwell towers in new library. |
|
|