Skip to Search

 
#

NOVEMBER 2004 PHOTOS

Library Construction Home

-FAQ

-Locations & Relocations

-Progress in Photos

-Architect:
 Long & Associates

-Library Consultant:
 Ross Barney + Jankowski

-Construction Manager:
 Biltmore Construction

-Documents:
Library Building Program (PDF)

Click on photos for larger view.

11-02-04third_fl_concrete.jpg (89793 bytes)

11-02-04Good_weather.jpg (48746 bytes) 11-02-04block_walls.jpg (74771 bytes) 11-02-04bricks.jpg (76325 bytes)
Third floor concrete curing; remainder to be poured Nov. 6 Good weather has speeded up steel and concrete work Block walls form stairwell structure Brick will cover block with windows above
11-02-04NW_corner.jpg (74412 bytes) 11-02-04AS_conf.jpg (60533 bytes) 11-02-045th_conf.jpg (69250 bytes) 11-02-04skylights.jpg (76447 bytes)
View from NW corner show bump-out and stairwell Access Services conference room takes shape on second floor Fifth floor conference room being framed Sixth floor space with skylights should be very pleasing
11-02-04insulated.jpg (77492 bytes) 11-02-04prefab.jpg (80717 bytes) 11-02-04plumbing.jpg (53863 bytes) 11-09-04first_floor.jpg (54310 bytes)
Insulated double-wall ducts will be clean and quiet Prefabricated ductwork for fifth floor; some assembly required Rough in and supports for fourth floor washroom fixtures First floor reading room
11-09-04admin.jpg (63322 bytes) 11-09-04doorway.jpg (74352 bytes) 11-09-04laying_block.jpg (84233 bytes) 11-09-04wet_cure.jpg (59506 bytes)
Fifth floor administrative offices New bricks close a doorway on the front of the building A supervisor explains how to lay the block Wet concrete  covered in plastic
11-09-04Biltmore.jpg (65804 bytes) 11-09-04curve.jpg (85302 bytes) 11-09-04View_from_flint.jpg (66814 bytes) 11-09-04tethers.jpg (54311 bytes)
Biltmore project managers discuss final staircase Curved wall View from Keene-Flint Hall Sixth floor roof work requires tethers
11-16-04glass_wall.jpg (65102 bytes) 11-16-04third_walls.jpg (77496 bytes) 11-16-04masonry.jpg (78743 bytes) 11-16-04copper.jpg (58719 bytes)
Curved wall of the north reading room Third floor walls going up Masons hard at work on the new third floor Inspecting the copper flashing on sixth floor skylights
11-16-04chilled.jpg (72190 bytes) 11-16-04toilet.jpg (65886 bytes) 11-16-04ducts.jpg (64849 bytes)  
Welding new chilled water lines for AC units State of the art toilet technology Fourth floor ducts and wall framing  

University of Florida Home Page